
While Floridians are anticipating the completion of the renovation to the 75-year-old Herbert Hoover Dike surrounding Lake Okeechobee during 2020, more water discharges, like those that occurred this winter, will likely be required after the work is complete, according to the U.S. Army Corps of Engineers.
“Our goal of the rehabilitation of the dike is to solve a public safety problem” of keeping nearby towns from flooding, said John Campbell, public affairs specialist with the Corps. “We don’t know the ecological problems that could occur if we keep the lake too high for too long. There’s not an unlimited amount of water that can be stored in Lake Okeechobee.”
The government is spending $1 billion to fix the dike.
This year El Nino turned Florida’s typically dry season into a wet season with 200 to 400 percent increases, depending on location, over the normal 12-inch dry season rainfall, according to the National Weather Service. When Lake Okeechobee gets too much rain, its decades-old dike, which protects nearby communities like Pahokee, Belle Glade and Clewiston from flooding, is in danger of failing from water pressure undermining the structure
Disclaimer
The information contained in South Florida Reporter is for general information purposes only.
The South Florida Reporter assumes no responsibility for errors or omissions in the contents of the Service.
In no event shall the South Florida Reporter be liable for any special, direct, indirect, consequential, or incidental damages or any damages whatsoever, whether in an action of contract, negligence or other tort, arising out of or in connection with the use of the Service or the contents of the Service. The Company reserves the right to make additions, deletions, or modifications to the contents of the Service at any time without prior notice.
The Company does not warrant that the Service is free of viruses or other harmful components